Abstimmung von Produktions- und Transportlosgrößen zwischen Zulieferer und Produzent
Autoren/Herausgeber: |
Hofmann, Christian |
---|---|
Erschienen: | 1994 |
Publikationsart: | Articles in Refereed Journals (National) |
ISBN/ISSN: | 0171-6468 |
erschienen in: | OR Spectrum |
Weitere Quellenangabe: | 16 (1) 1994, 9-20 |
Abstract
An extension is introduced to the multi-stage stationary lot-sizing problem with finite production rates by the time-concentrated transportation-process. This representation adequately demonstrates the relations between supplier, carrier and producer. With regard to the reconciliation of the decision variables of these institutional units one differentiates between a pure simultaneous, a pure gradual and two mixed simultaneous-gradual coordination methods. The differences and correspondences of the respective decision variables and the resulting cost functions are demonstrated by means of an analytical examination. Finally, a numerical analysis shows the distinctions in total cost between the pure simultaneous and pure gradual coordination method.